(281) 201-3544
  • Contact Us
Encino Environmental ServicesEncino Environmental ServicesEncino Environmental ServicesEncino Environmental Services
  • About
    • Careers
    • Locations
    • Leadership
  • Industries
    • Oil & Gas
    • LNG
    • Data Centers
    • Manufacturing
    • Landfills
    • Agriculture
  • Compliance Services
    • Flare & ECD Net Heat Value (NHV) Vent Gas Testing
    • Stack Testing
    • Engine Performance Testing
    • LDAR Services
    • Enclosed Combustion Device (ECD) Performance Testing
    • Catalyst Washing Services
    • Instrumentation Calibration
    • Pressure Relief Valve (PRV) Testing & Valve Greasing
  • Monitoring
    • Continuous Emissions Monitoring
    • Mobile Continuous Emissions Monitoring
    • EmSat™ Satellite Emissions Detection
    • Flare Monitoring
  • Products
    • OGI Handheld & Fixed Cameras
    • Enviromech™ Composite Thief Hatch
    • MOLE-DAS™ Combustion Intelligence System
    • SNITCH™ Tank Vapor Intelligence System
  • Advisory
    • Data Services and Management
    • Permitting and Regulatory Reporting
    • OGMP 2.0 Methane Reporting Support
  • News & Resources
    • All Blogs
    • FAQs
    • Press and Events
    • Guides | White Papers | Case Studies
....

Blog

Virginia Finalizes Data Center Generator Emissions Rule

By Encino | Data Centers, Newsletter Article, Permitting and Regulatory Reporting | 0 comment | 14 October, 2026 | 0

Virginia has finalized a rule that brings its air regulations into alignment with the state’s new data center generator law. For developers, operators, and their consultants, the update reinforces the need to coordinate generator selection, air permitting, and compliance testing early in project planning. Key Highlights Virginia’s new generator emissions regulation takes effect November 4,Read more

Texas Data Center Permit Pause

By Encino | Data Centers, Newsletter Article, Regulations and Initiatives | 0 comment | 24 September, 2026 | 0

Texas Pauses Data Center Permits Pending Grid and Water Review Key Takeaways On September 21, Governor Greg Abbott directed TCEQ to pause issuing permits related to data center projects until ERCOT completes its review. His letter also calls on other state agencies to hold related regulatory approvals while information is gathered. The permit directive buildsRead more

Data Center Permitting: Who Owns the Air Permit?

By Encino | Data Centers, Permitting and Regulatory Reporting | 0 comment | 18 September, 2026 | 0

Data centers are no longer just large electricity consumers. With emergency generators and an expanding fleet of behind-the-meter gas turbines and reciprocating engines, their air emissions can rival those of a small industrial facility. That means an air permit — and a clear answer to who holds it — is a core piece of dataRead more

Behind-the-Meter Power: Where Permian Gas Meets Data Center Demand

By Encino | Data Centers, Newsletter Article, Oil & Gas Industry | 0 comment | 27 August, 2026 | 0

Two of the country’s most pressing infrastructure challenges are beginning to intersect in West Texas. Oil production in the Permian Basin continues to bring increasing volumes of associated natural gas to the surface. At the same time, data center developers are seeking large amounts of dependable power on schedules that conventional grid expansion may struggleRead more

EPA Clarifies Acid Rain Program Applicability for Islanded Data Center Power

By Encino | Data Centers, Newsletter Article, Regulations and Initiatives | 0 comment | 27 August, 2026 | 0

The U.S. Environmental Protection Agency has clarified how the federal Acid Rain Program may apply to fully islanded power generation facilities, including facilities developed to serve data centers. The July 16, 2026, memorandum provides useful direction for projects that plan to generate electricity exclusively for a private customer without any physical connection to the largerRead more

Data Center Air Permitting Enters the Public Spotlight as Onsite Power Use Grows

By Encino | Air Permitting, Data Centers, Newsletter Article | 0 comment | 24 June, 2026 | 0

Air Permitting Is Moving Closer to the Front of Project Planning As data center development expands, onsite power generation is becoming a larger part of the air permitting conversation. Projects that include combustion turbines, diesel generators, or other emissions-producing equipment need to evaluate air permitting earlier in the planning process. Recent public concern around aRead more

OOOOb Flexibility Still Comes Down to Measurement and Records

By Encino | Data Centers, Newsletter Article, Permitting and Regulatory Reporting | 0 comment | 26 May, 2026 | 0

EPA recently finalized revisions to narrow technical portions of the 2024 oil and natural gas methane rule, commonly referred to as OOOOb and OOOOc. The revisions focus on temporary flaring and net heating value monitoring for certain flares and enclosed combustion devices. EPA also issued guidance clarifying limited circumstances where associated gas flaring may continueRead more

EPA Is Moving to Speed Air Permitting. Project Teams Still Need Defensible Data.

By Encino | Data Centers, Newsletter Article, Permitting and Regulatory Reporting | 0 comment | 26 May, 2026 | 0

EPA recently issued two actions aimed at reducing air permitting delays: new Title V guidance and a proposed change to how “begin actual construction” is interpreted under New Source Review. These actions may help permitting authorities and project teams move faster, especially for data centers, power generation, manufacturing, and industrial expansions. However, faster review doesRead more

The New Data Center Playbook Starts with Power

By Encino | Data Centers, Newsletter Article | 0 comment | 23 April, 2026 | 0

What the AI infrastructure surge signals for power, permitting, and emissions The next wave of data center development is not just a technology story. It is increasingly a power infrastructure story. For developers and operators, that changes the conversation in a meaningful way. Reliable generation is only part of the equation. As projects scale, teamsRead more

From CERAWeek 2026: Why Energy Security, Infrastructure Constraints, and Emissions Performance Are Becoming More Connected

By Encino | Data Centers, Newsletter Article | 0 comment | 22 April, 2026 | 0

CERAWeek 2026 brought together 11,000 participants from more than 2,350 companies across 90 countries under the theme “Convergence and Competition: Energy, Technology and Geopolitics.” The size of the event was impressive, but the real takeaway was the direction of the conversation. This year’s discussions reflected an energy market being shaped all at once by AI-drivenRead more

12

Categories

  • Air Permitting
  • Appendix K
  • Careers
  • CEDRI
  • Certified Gas
  • Continuous Emissions Monitoring
  • Data Centers
  • Emissions Monitoring
  • Emissions Reduction
  • Engine Testing
  • Events
  • FAQ
  • Flare Monitoring
  • Instrument Calibration
  • LDAR
  • LNG Industry
  • Methane Monitoring
  • Newsletter Article
  • NHV
  • OGMP 2.0
  • Oil & Gas Industry
  • OOOOb
  • Optical Gas Imaging
  • Permitting and Regulatory Reporting
  • Press Release
  • Regulations and Initiatives
  • RNG
  • Satellite Emissions Monitoring
  • Satellite Monitoring
  • Stack Emissions Testing
  • Thief Hatch
  • Video
  • Waste Emissions Charge
  • White Paper

Recent Posts

  • EPA Proposes Revisions to OOOOb/c Oil and Natural Gas Standards
  • Field Emissions Technician I – Midland, TX
  • Business Development Manager – Dallas, TX
  • Field Project Manager – Stack Testing – Pittsburgh PA
  • Field Project Manager – Stack Testing – Houston TX
Encino Environmental Services

Comprehensive Emissions Monitoring
& Compliance Solutions for Critial Infrastructure


We believe the future of industry belongs to companies that proactively manage emissions with better data, deeper expertise, and practical solutions that improve efficiency, support compliance, and help operations move forward with confidence.

Explore Encino

  • Emissions Monitoring | Methane Detection Solutions
  • Compliance Services
  • Advisory Services
  • News & Resources
  • Careers
  • Encino Environmental Services Privacy Policy

Encino Environmental Services

HEADQUARTERS

20302 Park Row Drive
Suite 1200
Katy, Texas 77449
(281) 201-3544


View all Encino Locations

© Copyright 2026 Encino Environmental Services | All Rights Reserved |
  • About
    • Careers
    • Locations
    • Leadership
  • Industries
    • Oil & Gas
    • LNG
    • Data Centers
    • Manufacturing
    • Landfills
    • Agriculture
  • Compliance Services
    • Flare & ECD Net Heat Value (NHV) Vent Gas Testing
    • Stack Emissions Testing
    • Engine Emissions Performance Testing
    • Leak Detection & Repair (LDAR)
    • Enclosed Combustion Device (ECD) Performance Testing
    • Catalyst Washing Services
    • Instrumentation Calibration Services
    • Pressure Relief Valve (PRV) Testing & Valve Greasing
  • Monitoring
    • EmSat™ Satellite Emissions Detection
    • Continuous Emissions Monitoring
    • Mobile Continuous Emissions Monitoring
    • Flare Monitoring
  • Products
    • OGI Cameras
    • Enviromech™ Composite Thief Hatch
    • MOLE-DAS™ Combustion Intelligence System
    • SNITCH™ Tank Vapor Intelligence System
  • Advisory Services
    • Data Services and Management
    • Permitting and Regulatory Reporting
    • OGMP 2.0 Methane Reporting Support
  • News & Resources
  • Contact
Encino Environmental Services