(281) 201-3544
  • Contact Us
Encino Environmental ServicesEncino Environmental ServicesEncino Environmental ServicesEncino Environmental Services
  • About
    • Careers
    • Locations
    • Leadership
  • Industries
    • Oil & Gas
    • LNG
    • Data Centers
    • Manufacturing
    • Landfills
    • Agriculture
  • Compliance Services
    • Flare & ECD Net Heat Value (NHV) Vent Gas Testing
    • Stack Testing
    • Engine Performance Testing
    • LDAR Services
    • Enclosed Combustion Device (ECD) Performance Testing
    • Catalyst Washing Services
    • Instrumentation Calibration
    • Pressure Relief Valve (PRV) Testing & Valve Greasing
  • Monitoring
    • Continuous Emissions Monitoring
    • Mobile Continuous Emissions Monitoring
    • EmSat™ Satellite Emissions Detection
    • Flare Monitoring
  • Products
    • OGI Handheld & Fixed Cameras
    • Enviromech™ Composite Thief Hatch
    • MOLE-DAS™ Combustion Intelligence System
    • SNITCH™ Tank Vapor Intelligence System
  • Advisory
    • Data Services and Management
    • Permitting and Regulatory Reporting
    • OGMP 2.0 Methane Reporting Support
  • News & Resources
    • All Blogs
    • FAQs
    • Press and Events
    • Guides | White Papers | Case Studies
....
NextPrevious

EPA Reconsiders Texas Ozone Nonattainment Decisions and Potential Permitting Impacts

By Encino | Emissions Monitoring, Newsletter Article, Regulations and Initiatives | 0 comment | 15 October, 2026 | 0

EPA’s September 29 announcement could lead to changes in air permitting requirements for industrial facilities in parts of Texas. The agency is reopening ozone nonattainment decisions, with potential implications for power generation and oil and gas operations. The announcement itself changes no area’s status.

Key Highlights

  • EPA will revisit Texas ozone nonattainment decisions, including actions affecting San Antonio, Houston-Galveston-Brazoria, and Dallas-Fort Worth.
  • Relief under Clean Air Act Section 179B can prevent escalation to a higher nonattainment classification. Formal redesignation to attainment requires a separate determination and statutory criteria.
  • EPA plans to propose reconsideration actions by the end of 2026 and finalize them in 2027.
  • Potential benefits for industrial projects depend on the final actions, the applicable ozone standards, and state implementation. Facilities should continue following current rules and permit conditions.
EPA Reviews Texas Ozone Nonattainment

What EPA Is Reviewing

EPA will reconsider Texas classifications under the 2015 ozone National Ambient Air Quality Standards, including San Antonio’s status, and the 2008 ozone status of Houston-Galveston-Brazoria and Dallas-Fort Worth. It will also revisit its 2022 disapproval of a Texas Section 179B demonstration addressing emissions transported from outside the United States. EPA has not determined the outcomes.

The current classifications provide context for the review. TCEQ lists the following ozone designations; the September announcement does not replace them.

Area 2015 ozone standard 2008 ozone standard
Houston-Galveston-Brazoria Serious nonattainment
6 counties
Severe nonattainment
8 counties
Dallas-Fort Worth Serious nonattainment
9 counties
Severe nonattainment
10 counties
San Antonio area Serious nonattainment
Bexar County
Attainment/unclassifiable
Bexar County

County boundaries differ by standard. Liberty and Waller counties are in the Houston area’s 2008 nonattainment area, but not its 2015 area. Rockwall County is in the Dallas-Fort Worth 2008 area, but not its 2015 area. The San Antonio 2015 nonattainment designation applies to Bexar County.

International Emissions and Attainment Are Different Questions

Section 179B(b) allows a state to demonstrate that an ozone area would have met its attainment deadline if emissions from outside the United States had not affected its air quality. If EPA accepts that demonstration, the area is exempt from the mandatory reclassification provision for failure to attain. The area can remain designated nonattainment.

EPA’s March 2026 Phoenix-Mesa decision illustrates the distinction. The agency accepted an international emissions demonstration and kept the area at moderate nonattainment, avoiding a higher classification. It did not redesignate the area to attainment. That decision offers context for the Texas review, rather than a prediction of its outcome.

A formal redesignation to attainment under Section 107(d)(3)(E) requires EPA to determine that the standard has been attained. Other criteria include an approved implementation plan, air quality improvement resulting from permanent and enforceable emissions reductions, an approved maintenance plan, and fulfillment of applicable Clean Air Act requirements.

TCEQ also submitted a new Section 179B(b) demonstration for Bexar County on July 2, 2026. That submission is a request for EPA review; it does not change the county’s designation.

Potential Effects on Power and Oil and Gas Projects

Ozone classifications affect when a facility becomes a major source and the requirements for construction or expansion. Nonattainment New Source Review can require stringent emissions controls and offsets, which are qualifying emissions reductions used to compensate for new emissions.

TCEQ’s guidance lists a 25-ton-per-year major source threshold for nitrogen oxides and volatile organic compounds (VOC) in severe ozone areas, compared with 50 tons per year in serious areas. Applicability considers emissions or potential to emit. Minimum offset ratios are 1.30 to 1 and 1.20 to 1, respectively. These are classification examples, not changes EPA has announced for Texas.

If the final actions change the applicable classification or designation, some projects could face different thresholds or offset obligations. For power generators and oil and gas facilities with combustion equipment or VOC emissions, that could affect project costs and permit planning. This is a potential implication of the permitting framework; EPA has not established project savings or faster approvals.

The effect also depends on both ozone standards. TCEQ directs applicants to use the more stringent requirement when two standards apply. Relief under the 2015 standard alone may therefore leave requirements under the 2008 standard in place.

Encino Perspective

EPA’s review could create opportunities to reduce permitting costs or reconsider planned expansions in affected Texas counties. The value for any facility will depend on which requirements change and whether another ozone standard or existing permit condition continues to impose the same obligation.

We recommend identifying those dependencies now. Confirm the county’s classification under both ozone standards, determine which requirements rely on that classification, and keep emissions calculations and equipment specifications current. This preparation can help project teams assess a final EPA action and determine whether it changes their permitting options.

Facilities should continue following current authorizations while the review proceeds. Before revising construction schedules or compliance plans, confirm the final action’s effective date, any necessary state implementation or permit changes, and the permitting requirements that apply afterward. A redesignation to attainment may change the review process while leaving other emissions control, testing, monitoring, and reporting obligations in place.

Encino Environmental Services supports air permitting, regulatory applicability reviews, and emissions testing and monitoring. Our team can help owners assess how a final EPA action affects their facility and identify the obligations that continue to apply.

Sources

  • EPA announcement of Texas ozone reconsiderations, September 29, 2026
  • TCEQ Houston-Galveston-Brazoria current attainment status
  • TCEQ Dallas-Fort Worth current attainment status
  • TCEQ San Antonio current attainment status
  • EPA Phoenix-Mesa Section 179B final rule, March 23, 2026, 91 FR 13777
  • EPA Green Book text of Clean Air Act Section 107, including Section 107(d)(3)(E)
  • TCEQ Prevention of Significant Deterioration and Nonattainment Fact Sheet, RG-636, revised May 2024
  • TCEQ San Antonio latest ozone planning activities, including the July 2026 Section 179B submission
  • TCEQ Major New Source Review Applicability Determination guide, revised January 2022

Disclaimer

This article is provided for general informational purposes and reflects EPA and TCEQ materials available as of October 1, 2026. It does not constitute legal advice or a facility-specific compliance determination. EPA’s reconsiderations are pending, and any regulatory changes depend on final agency actions and applicable effective dates. Requirements vary by location, equipment, emissions, and permit conditions. Owners and operators should confirm current obligations with qualified regulatory professionals before changing permitting or compliance plans.

No tags.

Related Posts

  • OGMP 2.0 Annual Conference Signals a More Measurement-Driven Future for Methane Management

    By Encino | 0 comment

    The 2026 OGMP 2.0 Annual Implementation Conference reinforced a message that is becoming increasingly clear across the energy sector: methane measurement is no longer just about reporting. It is becoming a critical tool for understandingRead more

  • EPA Proposes OOOB/C Rule Changes

    EPA Proposes Revisions to OOOOb/c Oil and Natural Gas Standards

    By Encino | 0 comment

    Key Highlights EPA announced proposed revisions to its 2024 OOOOb/c oil and natural gas standards on October 27, 2026, during President Trump’s visit to Lubbock, Texas. The proposal addresses well-site categories, the Super Emitter Program,Read more

  • Colorado Methane Rules and NHV Requirements

    Colorado Finalizes Methane Rules for Existing Oil and Gas Operations

    By Encino | 0 comment

    Colorado’s latest methane rule update gives oil and gas operators additional requirements for verifying that emissions are captured and combustion controls operate properly. The September action completes a series of revisions to Regulation 7 thatRead more

  • One Engine, Multiple Rules: How JJJJ, ZZZZ, Air Permits and Testing Fit Together

    Stationary Engine Compliance – One Engine Multiple Rules

    By Encino | 0 comment

    One Engine, Multiple Rules: How JJJJ, ZZZZ, Air Permits and Testing Fit Together Key Takeaways Engine compliance begins with classification. Fuel, ignition type, horsepower, construction date, operating purpose and the facility’s hazardous air pollutant sourceRead more

  • Texas Pauses Data Center Permits

    Texas Data Center Permit Pause

    By Encino | 0 comment

    Texas Pauses Data Center Permits Pending Grid and Water Review Key Takeaways On September 21, Governor Greg Abbott directed TCEQ to pause issuing permits related to data center projects until ERCOT completes its review. HisRead more

NextPrevious
Encino Environmental Services

Comprehensive Emissions Monitoring
& Compliance Solutions for Critial Infrastructure


We believe the future of industry belongs to companies that proactively manage emissions with better data, deeper expertise, and practical solutions that improve efficiency, support compliance, and help operations move forward with confidence.

Explore Encino

  • Emissions Monitoring | Methane Detection Solutions
  • Compliance Services
  • Advisory Services
  • News & Resources
  • Careers
  • Encino Environmental Services Privacy Policy

Encino Environmental Services

HEADQUARTERS

20302 Park Row Drive
Suite 1200
Katy, Texas 77449
(281) 201-3544


View all Encino Locations

© Copyright 2026 Encino Environmental Services | All Rights Reserved |
  • About
    • Careers
    • Locations
    • Leadership
  • Industries
    • Oil & Gas
    • LNG
    • Data Centers
    • Manufacturing
    • Landfills
    • Agriculture
  • Compliance Services
    • Flare & ECD Net Heat Value (NHV) Vent Gas Testing
    • Stack Emissions Testing
    • Engine Emissions Performance Testing
    • Leak Detection & Repair (LDAR)
    • Enclosed Combustion Device (ECD) Performance Testing
    • Catalyst Washing Services
    • Instrumentation Calibration Services
    • Pressure Relief Valve (PRV) Testing & Valve Greasing
  • Monitoring
    • EmSat™ Satellite Emissions Detection
    • Continuous Emissions Monitoring
    • Mobile Continuous Emissions Monitoring
    • Flare Monitoring
  • Products
    • OGI Cameras
    • Enviromech™ Composite Thief Hatch
    • MOLE-DAS™ Combustion Intelligence System
    • SNITCH™ Tank Vapor Intelligence System
  • Advisory Services
    • Data Services and Management
    • Permitting and Regulatory Reporting
    • OGMP 2.0 Methane Reporting Support
  • News & Resources
  • Contact
Encino Environmental Services